Allen-Bradley 2755 User Manual Page 51

  • Download
  • Add to my manuals
  • Print
  • Page
    / 96
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 50
Installing the Wiring Base and Power Supply 3–16
For network wiring, the wiring base has two DeviceNet terminal
blocks; one for incoming power and communications, the other for
outgoing power and communications. DeviceNet communications
requires 3 wires (2 communications, 1 ground) and a shield. You can
install the Reader in a single or multiple drop configuration. Up to 63
slave devices can be installed on a single DeviceNet master/slave
network. Up to 32 Readers can be installed on a DeviceNet
peer-to-peer network.
Reader
Other Devices
Reader Reader
Both DeviceNet terminal blocks are tied to each other. You can
connect the wiring to either terminal block. Use cabling (Catalog
No. 1485C-P1A50, -P1A150 or -P1A300) for all DeviceNet
connections.
Line
Termination
V+
Can_H
Shield
Can_L
V-
V+
Can_H
Shield
Can_L
V-
See DeviceNet Cable System Planning and Installation Manual
(Publication No. 1485-6.7.1) for recommendations and cable
accessories.
Line Termination
The two devices furthest apart from each other on a DeviceNet
network must be terminated. A termination switch is provided.
Only the devices at the ends of the network can be terminated.
Dev
i
ceNet
Connect
i
ons
Page view 50